Hollandse Kust (zuid) Wind Farm Zone Sites III and IV

A permit and, if necessary, a subsidy will be made available for the development of Hollandse Kust (Zuid) Wind Farm Zone Sites III (350 MW) and IV (350 MW). To do this, the Netherlands Enterprise Agency (RVO.nl) will be organising a procedure (a comparative assessment or a subsidy tender).

On 28 September 2018 the Minister of Economic Affairs and Climate Policy has informed the Dutch Parliament about the tender procedure for the offshore Wind Farm Zone Hollandse Kust (zuid) Wind Farm Sites III and IV (HKZWFS III and IV). Part of this procedure was the publication of a draft of the Ministerial Order for permitting offshore wind energy HKZWFS III and IV. A translation was provided and there was a consultation about this draft version.

The Ministerial Order for permitting offshore wind energy

The Ministry of Economic Affairs and Climate Policy published the Ministerial Order for permitting offshore wind energy on 3 December 2018 in the Government Gazette. The publication of this order is in Dutch. An English translation is available. The translation is an unofficial document: it is only provided for convenience, rights do not apply.

The Central Government Real Estate Agency

Approximately 70% of both Wind Farm Sites Hollandse Kust (zuid) III & IV are located within the 12 miles zone of the Dutch territories. This means a seabed lease has to be established between the wind farm operator and The Central Government Real Estate Agency. Apart from the seabed lease for the wind turbines, a rental agreement for the infield cabling between the wind turbines and the TenneT platform has to be signed. An English translation of the Seabed Lease, Rental Agreement, General Terms and Conditions can be found below.

From November 13th until November 23rd 2018 17:00 hours CET there was a consultation about draft versions.

Right to the seabed lease

The Central Government Real Estate Agency has calculated the cost for the right to the seabed lease at these sites, based on a rate of € 0.98 per MWh every year, using a fixed total capacity of 350 MW and 4,000 full load hours. The payment is fixed and independent of the final actual installed capacity or output from the wind farms and is only required for the part of the wind farm within the 12 miles zone. For Site III this is 71.85% and for Site IV it is 68.23%.
The amounts for the first year of operation have therefore been fixed at:

  • Site III: € 985,782.00/year
  • Site IV: € 936,115.60/year

These annual payments will be required 4 years after the permits have become irrevocable and will be indexed for the period of operation.

Reservation fee

From the moment the permits are given to the winner up to the moment of the payment of the right of superficies seabed lease, a fee of € 650/MW/year has to be paid for the part of the site within the 12 miles zone (Site III 71.85% and Site IV 68.23%). This translates to:

  • Site III: € 163,458.75/year
  • Site IV: € 155,223.25/year

These payments (indexation) will also be required for the period from when the wind farm ceases operation until it has been fully decommissioned and removed.

Rental price cables

The rental price for the infield cables is fixed at a one-off amount of € 3.17 per m2 impacted corridor. The width of the impacted corridor is fixed at 0.3 m. For Site III, the impacted part is calculated as a total cable length of 60 km, whilst for Site IV the calculated length is 70 km.
The rental price for the cables and pipes have therefore been fixed at:

  • Site III: € 40,997.61 (one-off payment)
  • Site IV: € 45,420.71 (one-off payment)

The final documents with all the requirements will be published in mid-December.

Information Session tender Hollandse Kust (zuid) Sites III and IV

On 15 November 2018 the Netherlands Enterprise Agency organised an information session. In this session we provided you an update on the Ministerial Order for permitting Offshore Wind Energy 2018, the subsidy and permit, the application forms and model for operational calculation. The presentations are available in Dutch and English.

Site Studies

RVO.nl has commissioned various studies in relation to the wind farm zone in preparation for this procedure. All available data will be published at www.offshorewind.rvo.nl. RVO.nl will also provide a comprehensive description of both sites in this wind farm zone in the Project and Site Description (PSD).

Project and site description

The Project and Site Description (PSD) was designed to help any party with an interest in participating in the planned permit tender for Hollandse Kust Zuid Wind Farm Sites III and IV (HKZWFS III and IV), in the Hollandse Kust (Zuid) Wind Farm Zone in the Netherlands. The document describes the site, surroundings and characteristics of HKZWFS III and IV.

The magazine Hollandse Kust, where wind and water works shows what the region has to offer for offshore wind energy.

Wind Farm Site Decisions

The final Wind Farm Site Decisions for Hollandse Kust (zuid) Wind Farm Sites III and IV were published in the Government Gazette on Friday, 19 January 2018. The term for inspection for these Wind Farm Site Decisions ran between 19 January 2018 and 2 March 2018. The Council of State has received appeals. A reaction from the Council of State is to be expected. Further information is available in Dutch.

(wind) energy yield calculation

When creating a wind report you will have to take into account:

Service menu right