Hollandse Kust (west) Wind Farm Zone

Last checked on:
1 August 2024
Published on:
9 December 2019

You could submit a permit application(s) for Hollandse Kust (west) Wind Farm Sites VI and VII until 12 May 2022. The results of the tenders are known. The winners are building the wind farms. You can no longer submit applications.

Permit results

On 15 December 2022, Minister for Climate and Energy Rob Jetten announced that the permit for Wind Farm Site VI of the Hollandse Kust (west) Wind Farm Zone has been awarded to Ecowende, a consortium of Shell and Eneco.

On 10 November 2022, Minister for Climate and Energy Rob Jetten announced that the permit for Wind Farm Site VII of the Hollandse Kust (west) Wind Farm Zone has been awarded to Oranje Wind Power II, a subsidiary of RWE AG.

Current ownership

Ecowende is currently a joint venture of Shell, Eneco and Chubu. Oranje Wind Power II is property of RWE AG and TotalEnergies.

Applications for Site VI

Applications for Site VII

Which area is it?

Hollandse Kust (west) Wind Farm Zone (HKWWFZ) is located approximately 28.6 nautical miles (53 kilometres) off the west coast of the Netherlands. The total surface area of the Wind Farm Sites within the zone (including maintenance and safety zones) is approximately 176 km2. Hollandse Kust (west) Wind Farm Zone will accommodate 1,400 MW of offshore wind power capacity. Transmission system operator TenneT will construct 2 offshore platforms with 2 grid connections within the HKWWFZ.

Ministerial Orders

On 9 March 2022, the Ministry of Economic Affairs and Climate Policy published the Ministerial Orders for Sites VI and VII of the Hollandse Kust (west) Wind Farm Zone (Dutch) in the Government Gazette. The final drafts of the Ministerial Orders were translated and can be found in Appendix A of the Project and Site Description Hollandse Kust (west). These translations are unofficial documents and are only provided for convenience. Rights do not apply.

Policy rule amendment

The policy rule amendment of the permit for offshore wind energy for Hollandse Kust (west) Site VI and Site VII, will explain the conditions under which the permit may be amended. The premise is all ranking scores will remain the same or improve as a result of the amendment. Also, no 'exchange' of points between different criteria may take place. A translation of the Government Gazette publication is available. This is an unofficial document and are only provided for convenience. Rights do not apply.

Wind Farm Site Decisions

In the Government Gazette of December 9, 2021, notification was made of the publication of the Hollandse Kust (west) Wind Farm Site Decisions VI and VII. The Wind Farm Site Decisions were available for review until Friday, 21 January 2022. The Wind Farm Site Decisions are irrevocable.

On 25 February 2022 Hollandse Kust (west) Wind Farm Site Decisions VI and VII were published in the Government Gazette. These publications are written in Dutch. English translations are available in Appendix A of the Project and Site Description Hollandse Kust (west). The translations are unofficial documents and only provided for convenience. Rights do not apply.

Site characterisation studies

The Netherlands Enterprise Agency has commissioned various studies about Hollandse Kust (west) Wind Farm Zone in preparation for this procedure. All available data will be published at offshorewind.rvo.nl.

Description Wind Farm Sites

You can find a description of the Offshore Wind Farm Zone Hollandse Kust (west) Site VI and VII, including a summary of available site characterisation studies in the Project and Site Description Hollandse Kust (west) (June 2021) and appendices:

Appendix A has English translations of applicable law and application forms. These translations are unofficial documents and are only provided for convenience. Rights do not apply.