Permit for IJmuiden Ver Wind Farm Site Gamma-B
The content of this page has been checked on 23 July 2026
Permit applications for the Gamma-B site in the IJmuiden Ver Wind Farm Zone (IJVWFZ) will open from 26 November 2026 until 10 December 2026. This permit will allow the construction and operation of an offshore wind farm with a capacity of approximately one gigawatt (GW). We will run a tender process for the permit and the best application will be awarded the permit.
Budget
Permit with subsidy
On 3 April we announced this subsidy tender round for construction and operation of a new offshore wind farm, at the IJVWFZ Gamma-B site in the North Sea. This follows our January 2026 announcement of the permit round for the IJmuiden Ver Gamma-A site.
On 12 June 2026, it was announced that the final regulations included a higher subsidy amount than had been initially announced. A total of €4.698 billion has now been reserved. Primarily to address uncertainty surrounding the potential feed-in tariff set by the Netherlands Authority for Consumers & Markets (ACM, Autoriteit Consument & Markt in Dutch). Following the consultation, we also made further adjustments to the final regulations for Gamma-B, which you can read below. With these subsidy tenders, we expect to improve the business model for offshore wind energy. The further development of offshore wind is essential for the energy independence and resilience of the Dutch energy system.
For more details, read the full Letter to Parliament (June 2026) below.

Location of the IJmuiden Ver Gamma-B site
Which areas are involved?
IJmuiden Ver Site Gamma-B is located in the North Sea, approximately 61 km off the west coast of the Netherlands. The site covers an area of 95 km2 and provides space for a 1 GW offshore wind farm.
Site Gamma-B is part of the IJVWFZ. This zone consists of 4 sites (Alpha, Beta, Gamma-A, and Gamma-B), with a total area of approximately 609 km2 (including maintenance and safety zones). Together, these 4 sites can support around 6 GW of installed offshore wind energy capacity.
Permits for the IJV Alpha and Beta sites were issued in 2024. More information about these sites can be found at Permits for wind farms at IJmuiden Ver Alpha and Beta. Information about the IJV Gamma-A site can be found at Permit for IJmuiden Ver Gamma-A wind farm.
How does electricity get from sea to land?
Transmission system operator TenneT is installing the offshore grid that will connect the wind farms to the onshore high-voltage grid. This is how the wind energy generated is fed into our electricity grid. The wind farm will be connected to a TenneT substation platform for this purpose. The platforms have a 2 GW Direct Current (DC) connection to an onshore substation. This means that 2 wind farms, each with a capacity of 1 GW, will be connected to a single platform. The DC connection ensures a constant voltage on the electricity grid.
The IJV Gamma-A and IJV Gamma-B sites (both 1 GW capacity) will connect to a single offshore energy platform. This ensures the best possible use of the offshore grid. Connecting both sites to a single platform also requires less work and time.
For more information about the offshore grid, see the Offshore Wind Energy Development Framework in Landfall of offshore wind energy: from sea to land. The Development Framework covers topics such as the design, construction, and lifespan of the offshore grid.
The development framework was recently updated following the release of the final regulations for IJVWFZ Gamma-A and IJVWFZ Gamma-B. You can read the full updated document (May 2026) and the corresponding Letter to Parliament in the Official Announcements below.
Who is this for?
This subsidy tender is open to wind farm developers and energy companies planning to build and operate an offshore wind farm at the IJmuiden Ver Gamma-B site. This subsidy tender is for businesses committed to generating sustainable energy and contributing to the energy transition.
How much subsidy is available?
In this tender, you can apply for a permit for the Gamma-B site with subsidy, or you can submit a subsidy-free bid in an auction. Both procedures run simultaneously, you can choose which one to participate in. A total of € 4.69 billion in subsidies is available for this tender.
Higher subsidy amount due to feed-in tariff
We are increasing the maxiumum tender amount for IJV Gamma-A from €0.104 to €0.117 per kilowatt-hour.
The main reason is that the ACM is working on potentially introducing a feed-in tariff. This mean electricity producers will contribute to the cost of the electricity grid. As a wind farm developer, you may face higher costs, which could create uncertainty in the business case for your wind farm project. To remove this unvertainy for this tender, we are increasing the maximum susidy amount.
Conditions
You must meet a number of general conditions and pre-qualification criteria. These are outlined in the draft Ministerial Order (in Dutch). The conditions apply to all applications (with or without subsidy). We will rank your application if it meets the pre-qualification criteria and general terms.
How can your application score higher?
We process auction bids first, followed by subsidy applications. You can find this procedure in the Explanatory Notes accompanying the draft Ministerial Order.
- In the auction, the application with the highest bid ranks first.
- For subsidy applications, the lowest subsidy request ranks first. The highest-ranked application receives the permit - and, in the case of the subsidy procedure, the subsidy.
Preparing your application
We will post important documents for your application on this page. This allows you to start preparing your application well before the application period opens. The following documents are already available. An explanation is provided with each document. We will continue to supplement these documents.
Final regulations for IJmuiden Ver Gamma-A
Final regulations for IJmuiden Ver Gamma-A
The online consultation for IJmuiden Ver Gamma-A has been completed. We have incorporated your feedback into the final regulations (attached below), published on 18 June 2026.
Adjustments to tender regulations due to EU rules
Based on the feedback received, we have made various changes and clarifications to the final tender regulations, particularly to meet the requirements of the EU Net Zero Industry Act (NZIA). This ensures compliance with EU legislation, which requires the Netherlands to produce at least 40% of the necessary net-zero technologies within Europe by 2030. This reduces our dependence on foreign supply chains.
Wind Farm Site Decision
Wind Farm Site Decision
Use the Wind Farm Site Decision (WFSD) to prepare your application. It contains site boundaries and the conditions you must adhere to when building and operating the wind farm. These conditions include, among other things, nature conservation. This WFSD for IJV Site Gamma-B (in Dutch) became irrevocable on 28 June 2025.
For your reference, we have provided an unofficial translation of the regulations (attached below). This is an updated version. The previous version contained incorrect coordinates.
Amendments to Wind Farm Site Decisions
Amendments to Wind Farm Site Decisions (WFSDs) were available for public inspection until 13 March 2026. Until then, anyone could submit their views on the planned amendments. All WFSDs are now final. As a wind farm developer, you need the WFSD amendments for applications in upcoming tenders. This is because the amended WFSDs contain important adjustments that were not included in the previous version of the WFSD. Without this information, your application will be incomplete. Some amendments also apply retroactively to projects already operating or permitted and under construction.
Wind farm temporarily shut down during bird migration
With the January 2026 WFSD amendments (in Dutch), we are adjusting the rules for wind farms in the Borssele, Hollandse Kust, IJmuiden Ver, and Nederwiek Wind Farm Zones. We aim to prevent bird strikes with this measure.
We are doing this by:
- temporarily shutting down turbines during mass bird migration;
- using a prediction model to determine when this is necessary;
- limiting the downtime of turbines to a maximum of 60 hours per year.
Read more about this WFSD amendment (in Dutch).
Cybersecurity in wind farms
With the February 2026 amendments (in Dutch), we are amending the WFSDs for IJmuiden Ver Gamma-A and -B, and Nederwiek I-A. It is now mandatory for the management of wind farms to take place within the European Economic Area (EEA). This ensures compliance with the new EU rules on cybersecurity and data security.
Read more about this WFSD amendment (in Dutch).
Site characterisation studies
Site characterisation studies
Together with our partners, we conduct site studies in the IJVWFZ. The data and reports from the site studies are published on offshorewind.rvo.nl (English). With the data from these site studies, you can plan and optimise the design of the offshore wind farm.
Memo Boundaries & Coordinates IJV Site Gamma-B
Memo Boundaries & Coordinates IJV Site Gamma-B
The Memo Boundaries & Coordinates for IJmuiden Ver Site Gamma-B is available upon request. The information in the Memo is confidential. To request a copy of the Memo, you can send an email to woz@rvo.nl.
We will then assess your application. If your request is approved, we’ll ask you to sign a Non-Disclosure Agreement (NDA) before receiving the Memo.
The Memo includes:
- a Word file with maps, figures and tables
- an Excel file with the corresponding coordinates
You can use the coordinates and boundaries in this memo to design your future offshore wind farm.
Step-by-step plan for your application
Step 1: gather the required attachments
Step 1: gather the required attachments
When submitting your application, there are attachments that you must submit as mandatory. You will soon find out on this page which supporting documents are required and what information they must contain.
Step 2: create your application
Step 2: create your application
You can submit your application during the application period. Follow these steps:
- Click on the button: 'Submit your application now' at the top of this page. You will then enter our digital application environment.
- Log in using eHerkenning or DigiD.
- For your application with eHerkenning (online authentication), you need at least level 3 with authorisation for RVO services at level eH3.
- If you do not have eHerkenning yet, apply for it in time. Please note that processing may take several working days.
- It is not possible to submit an application with a chain authorisation. Read more about the different ways to log in.
- First time logging in? You will be directed to a profile page. Fill in all the mandatory fields and save them. You will then be logged out and must log in again.
- Via the tab 'Nieuwe aanvraag' (new application), select the form for this application round. The exact name of the form will be available on this page at a later date.
- Complete all the required details for your application in the form.
- Review your input using the button 'Controleer' (check) before moving to the next tab. If any information is missing or incorrect, you will receive a notification.
- In the last tab of the application form, you will upload the attachments. Mandatory attachments are marked with an asterisk (*).
- Double-check your application for errors before submitting it. If you receive error messages, go to the relevant tab and correct your input.
Please note the following:
- Your application form will be automatically saved when you move to the next tab. You can also save your data manually in between. You can log out after saving, and log back in later to continue from where you left off.
- Scan all your attachments first and upload them into the digital application environment. If a file exceeds the 40 MB limit per attachment, submit the attachment in multiple parts along with your application.
Step 3: submit your application
Step 3: submit your application
- To submit your form, click on the button 'Naar verzenden' (proceed to submission) under the tab 'Controleren' (check) in the digital application environment. All the questions and answers will then be displayed on the screen. Carefully check your application again and ensure that you have attached all the necessary permits and attachments.
- Tick the box 'Verklaring en ondertekening' (declaration and signature). Submit your application definitively by clicking the button 'Ondertekenen en verzenden' (sign and submit).
Please note the following:
- Immediately after submission, you will receive a confirmation of receipt with a project number at the email address you provided in your profile. You will use this number for any correspondence regarding your application.
- You can find your application and the confirmation of receipt under 'Mijn aanvragen' (my applications) in the digital application environment, as long as you are still authorised.
Questions and answers on the permit
Below you will find answers to questions about the application stage (in Dutch). We update this document regularly. We will send you a notification as soon as a new version is available.
After your application
After the application period closes, we expect:
- To grant the permit in the first quarter of 2027.
- For IJmuiden Ver Gamma-B to become operational in 2032.
Official announcements
- Letter to Parliament (3 April 2026) announcing the subsidy tender IJmuiden Ver Gamma-B (in Dutch)
- Letter to Parliament (16 May 2026) regarding delay of Gamma-A and Gamma-B tender
- Policy rule (3 July 2026) on the amendment and revocation of the licences for IJmuiden Ver Gamma-A and Gamma-B (in Dutch)
Questions about offshore wind energy?
If you have any questions about offshore wind energy, feel free to email us at woz@rvo.nl.
Stay updated
Tip: want to stay informed about updates to this page? Click the 'Stay informed via email' button at the top of this page. You’ll receive an email whenever the information on this page changes.